Stainless steel tube fabrication

stainless steel tube fabrication

China metal fabrication manufacturer offer Stainless steel tube fabrication service. Besides of stainless steel tube,we also full range of metal forming, such as stamping ,deep drawing, laser cutting ,welding , bending ,plating,and assembly,the material include Steel,copper,Aluminium,stainless steel etc.

 Custom Metal Fabrication

Product Name Metal Fabrication

Materials

Steel Sheet: Carbon / Mild / Structural / Die Steel, etc.
Steel Plate: Zinc Plate / Hardox Wear Plate, etc.
Structural Steel: Die / Pipe / Tube / Bar etc.
Stainless Steel: 302 / 304 / 316 / 410 etc.
Aluminum: 5000 / 6061 / 6063 / 6066 / 6082, etc.
Other Materials

Dimensions

(Length x Width x Thickness x Height) mm

Laser Cutting Range: L6,000 x W2,000 x T25mm.
Plasma Cutting Range: L12,192 x W 2,438.4 x T50mm
Shearing Range: 4,000 x T18mm
Bending Range: W7,200 x T16mm
Rounding Range: Ø>400 ×T28 x H3,048mm
Punching Range: W1,524 × H3,048 × T9mm
Tolerance ±0.2mm (0.007874inch) ~ 0.3mm (0.011811 inch).
Machining Equipment Laser Cutting: Trumpf TCL 3060 & 6030
Laser Engraving: LSF201
Plasma Cutting: ProArc Master 45
Shear: Swing Beam Hydraulic NC-31200 & NC-41065
Bend: 200 Ton 4.2M & 500 Ton 4.2M & 1,000 Ton 7.2M
Round: Steel Sheet, Flange, Structure & Pipe.
Punch: Belgium multi-function automatic machine
Drill: CNC FSD1020
Others: Steel Sheet Auto Storage & Overhead Crane

Surface

Treatment

Polishing, Zinc plating, Nickel plating, Chrome Plating, Powder Coating, Anodizing, E-coating, Sandblasting, Spray Coating, Electroplating, Mirror Polish, Brushing or Customized.
Sample Available
Certification D-U-N-S, ISO system.
Service Type OEM / ODM

Fabrication services

Payment
1. 100% T/T remittance in advance.
2. 50% T/T against Proforma Invoice confirmed, rest 50% T/T before shipment.
3. 100% irrevocable L/C at sight.

Packing
1. According to the sea shipping and the air shipping export packing.
2. Bubble bag/pc + wooden case with waterproof + pallet + fumigation.
3. In compliance with customer requirement.

Shipping
1. Working Day: Normally 15~20 days.
2. If you are very urgent, we can do our priority for you.
3. According to your quantity order extension working day.

Menu